All drawings and verbiage within the plans will be updated to show all changes.
All new elevator bolts now sold by the All American are now silver or zinc coated. If you can’t purchase these locally you may use black elevator bolts also.
S-3 Weights: All non-adjustable weight bolts will be 3”x 5/16” elevator bolts. The adjustable weight bolts will 6”x‘5/16” carriage attached to the top of floorboard with 5/16” washer ant nut.
S-4 Axles: b. Remove (exception-particle floorboard). This floorboard is no longer permitted.
S-5 Lettering and
Decorations: The
shell may be covered with decals, lettering or felt –tip markers as specified
in the next sentence.
S-6 Prohibited
Assembly: Add. J. Do not sand machine marking off the edge of the floorboard or
bevel or round the edges of the floorboard.
13. Add (cannot be drilled).
14. Delete the mention of the
particleboard floorboard. Not permitted in 2005.
STEP 1: FLOORBOARD
2. Add shim with a water base wood
putty.
3. Delete sentence.
STEP 2:FLOORBOARD
2 Add, The foot brace new
dimensions are 1 5/16” x 1 ˝” x 3”.
STEP 5:MOUNTING
STEERNG AND BRAKE
Figure 5.3A delete. Pg.10
STEP 6: Steering and Axles
Page 9: Figure 5.3 is the correct drawings for
installing awning pulley. Under drawings will
State, Install AA
Pulley And Bushing Per Drawing.
Steering
1. Add, on the steering/brake assembly you may add 2 additional N washers to any or all of the 4 pulleys you may use in the setup of your steering.
4. Fig. 6.5 and 6.5A&B are the only
allowable options to running the steering cables.
Figure 6.4: Safety wire is no longer needed when using
the two stop nuts on the steering turnbuckles.
Figure 6.5 A&B Are the only
Optional Pulley Configurations.
Figure 6.6 plate
shown in drawing is the steering/brake assembly. Also to added to drawing is the wording, Two
additional N washers may installed to raise any of the 4 pulleys on the
steering/brake assembly.
STEP 8: WEIGHT
1. Add Carriage after 5/16”.
STEP 9: FINAL ASSEMBLY
2. Add, An additional screw and washer
will be installed through the shell into the into the
floorboard in the center of the nose.